  "S01": {
    "title": "SpaceX 歐洲公開說明書",
    "date": "2026-06-05",
    "url": "https://content.spacex.com/cms-assets/FINAL_Documents%20and%20Updates/SpaceX%20-%20EU%20Prospectus%20%28Approved%20by%20Bafin%29%20-%20June%205%2C%202026.pdf",
    "locator": "PDF 第 64 頁（印刷頁 51）：兩批叢集；第 118 頁（印刷頁 105）：供電能力陳述；第 77 頁：跨兩座設施之商務安排",
    "type": "公司披露",
    "scope": "官方免費 PDF；2026-10-20 重核第 64 頁文字。210／220 MW 與 91／64 天為公司披露，非獨立驗收。同頁首座 gigawatt 叢集說法另引 SemiAnalysis，不採作獨立證據；供電與商務段落沿用先前查核範圍。",
    "checked_at": "2026-10-20"
  },
  "S02": {
    "title": "xAI／SpaceXSI：Greater Memphis Area Site Updates",
    "date": "2026-07-30",
    "url": "https://x.ai/memphis/updates",
    "locator": "2026-07-30 更新全文",
    "type": "公司披露",
    "scope": "69 部臨時機組、1.2 GW／41 部永久方案與撤除承諾；不證明 10 月實際機組數。",
    "checked_at": "2026-10-13"
  },
  "S03": {
    "title": "MDEQ enSearch：MZX Tech LLC，AI ID 12592",
    "date": null,
    "url": "https://opc.deq.state.ms.us/ai_info.aspx?ai=12592",
    "locator": "Active Permits / Current Status；0680-00119",
    "type": "主管機關資料庫",
    "scope": "可確認 2026-03-11 施工許可紀錄；網站聲明以行政原卷為準，非完整許可全文。",
    "checked_at": "2026-10-13"
  },
  "S04": {
    "title": "MCEQ–MZX Agreed Order 7739 26（律所託管之簽署文件副本）",
    "date": "2026-07-30",
    "url": "https://www.mitchellwilliamslaw.com/webfiles/MCEQ%20MZX.pdf",
    "locator": "本輪未完成正文與官方版本核對；原頁碼不作現行證據定位",
    "type": "行政文件副本",
    "scope": "停止採證。律所保存的七月副本未與官方原件核對；九月已有修正摘要，不以七月版本代表現行完整命令。較窄歷史描述改見 S19／S20。",
    "checked_at": "2026-10-20",
    "status": "excluded"
  },
  "S05": {
    "title": "Oracle：Project Jupiter 採用 Bloom 燃料電池",
    "date": "2026-04-27",
    "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
    "locator": "公告前兩段",
    "type": "公司披露",
    "scope": "最高 2.45 GW installed fuel-cell capacity 的規劃公告，不是已營運 IT 負載。",
    "checked_at": "2026-10-13"
  },
  "S06": {
    "title": "Certarus：Utah Expansion & Data Center Project",
    "date": "2026-05-14",
    "url": "https://certarus.com/certarus-utah-expansion-and-data-center-project",
    "locator": "公告首段",
    "type": "供應商披露",
    "scope": "60 MW 客戶合約及預計啟用，未具名 Oracle；不能單憑此頁認定客戶或完工。",
    "checked_at": "2026-10-13"
  },
  "S07": {
    "title": "TNW：Oracle moves gas by trucks to keep its AI data centres on schedule",
    "date": "2026-10-08",
    "url": "https://thenextweb.com/news/oracle-trucked-gas-data-centres-europe",
    "locator": "正文第 1–7 段",
    "type": "媒體轉述",
    "scope": "轉述 Bloomberg；原報導全文未取得。Jupiter 為考慮採用；四倍以 hub price 為分母；40 分鐘為轉述估算。",
    "checked_at": "2026-10-13"
  },
  "S08": {
    "title": "Investing.com：Green Chile 延期報導（印度站同文）",
    "date": "2026-08-15",
    "url": "https://in.investing.com/news/stock-market-news/new-mexico-gas-pipeline-for-oracle-data-center-delayed-to-2027-93CH-5558266",
    "locator": "正文第 1–4 段",
    "type": "媒體轉述",
    "scope": "可讀到預期投運日期；未取得 Transwestern／FERC 原件。文中流量單位異常，不採用該數值。發布日按本頁顯示，原申報日仍待原件。",
    "checked_at": "2026-10-13"
  },
  "S09": {
    "title": "EIA：Energy units and calculators explained",
    "date": null,
    "url": "https://www.eia.gov/energyexplained/units-and-calculators/",
    "locator": "Sample Btu conversion factors",
    "type": "政府技術資料",
    "scope": "1 kWh = 3,412 Btu 支持單位換算；不支持本研究假設的燃料價格或設備效率。",
    "checked_at": "2026-10-13"
  },
  "S10": {
    "title": "SemiAnalysis：The Chinese AI Infrastructure Boom",
    "date": "2026-09-25",
    "url": "https://newsletter.semianalysis.com/p/the-chinese-ai-infrastructure-boom",
    "locator": "免費預覽導言及 China’s datacenter industry: built retail-first, flipped by AI 段落",
    "type": "付費文章的免費預覽／作者觀察",
    "scope": "作者 Everlyn、Dylan Patel、Patrick Schaabi；僅使用原站免費預覽的市場分化觀察。未讀付費正文、逐公司分析或底層模型，未重製原圖表。",
    "checked_at": "2026-10-20"
  },
  "S11": {
    "title": "VNET：2026 年第二季未經審計業績（SEC Exhibit 99.1）",
    "date": "2026-08-18",
    "url": "https://www.sec.gov/Archives/edgar/data/1508475/000110465926098054/tm2623481d1_ex99-1.htm",
    "locator": "Second Quarter 2026 Operational Results 與註 1–5",
    "type": "公司披露／未經審計",
    "scope": "截至 2026-06-30，公司批發在建容量 585 MW；不能證明未來 12 個月交付或大部分位於烏蘭察布。批發 MW 與零售機櫃口徑不同，非 GPU 利用率。",
    "checked_at": "2026-10-20"
  },
  "S12": {
    "title": "發改數據〔2023〕1779 號：東數西算實施意見",
    "date": "2023-12-29",
    "url": "https://www.ndrc.gov.cn/xxgk/zcfb/tz/202312/t20231229_1363000.html",
    "locator": "第（一）至（五）、（七）及（十三）項；日期採網頁發布日",
    "type": "政策原文",
    "scope": "讀取歷史政策架構；未查核全部後續修法與地方執行，2025 目標不當成已達成。",
    "checked_at": "2026-10-13"
  },
  "S13": {
    "title": "DeepSeek 團隊：Insights into DeepSeek-V3，arXiv:2505.09343v2",
    "date": "2025-12-23",
    "url": "https://arxiv.org/abs/2505.09343v2",
    "locator": "Abstract；本次讀取摘要及版本資料",
    "type": "作者技術論文",
    "scope": "只用於記憶體、運算、互連及軟硬體協同的研究切入點；不推論全中國效率。",
    "checked_at": "2026-10-13"
  },
  "S14": {
    "title": "MZX 第 4 期雙週報信件（第三方公開保存副本）",
    "date": "2026-09-23",
    "url": "https://rachelandthecity.com/the-xai-files/records/upcoming-hearing/mzx-removal-report-4-2026-09-23.pdf",
    "locator": "本輪未完成正文與官方版本核對；原頁碼不作現行證據定位",
    "type": "公司顧問向主管機關提交的信件鏡像；待官方副本核對",
    "scope": "停止採證。第三方副本未核對官方同件；不再據此陳述某期退役或移除情況。",
    "checked_at": "2026-10-20",
    "status": "excluded"
  },
  "S15": {
    "title": "MDEQ 關於五台機組完工狀態的往返信件（第三方副本）",
    "date": "2026-09-23",
    "url": "https://rachelandthecity.com/the-xai-files/records/upcoming-hearing/mdeq-whitlock-construction-not-complete-2026-09-23.pdf",
    "locator": "本輪未完成正文與官方版本核對；原頁碼不作現行證據定位",
    "type": "主管機關往返信件鏡像；待官方副本核對",
    "scope": "停止採證。第三方往返信件未核對官方同件；不再據此陳述設備 ID、撤回通知或調試狀態。",
    "checked_at": "2026-10-20",
    "status": "excluded"
  },
  "S16": {
    "title": "VNET：2026 第二季業績電話會議稿",
    "date": "2026-08-18",
    "url": "https://ir.vnet.com/static-files/2981e24f-4e4e-4482-a0a8-903a585d3b54",
    "locator": "本輪未完成正文與官方版本核對；原頁碼不作現行證據定位",
    "type": "公司前瞻披露",
    "scope": "官方季報索引確有此下載項目，但本輪正文存取受阻；不據此陳述未來交付期限或園區分配。585 MW 在建僅依 S11。",
    "checked_at": "2026-10-20",
    "status": "excluded"
  },
  "S17": {
    "title": "GDS：2026 第二季業績簡報",
    "date": "2026-08-13",
    "url": "https://investors.gds-services.com/system/files-encrypted/nasdaq_kms/assets/2026/08/13/9-41-50/GDS%202Q26%20Earnings%20Presentation%200813%20FINAL(4).pdf",
    "locator": "印刷第 6 頁／PDF 第 7 頁：2Q26 Bookings (Excluding Reservations)",
    "type": "公司訂單披露",
    "scope": "官方免費 PDF；New Build bookings（excluding reservations）：烏蘭察布 70 MW、韶關 83 MW Power。非已送電、已驗收 IT 負載或有效算力；僅摘要必要事實，不重製原表。",
    "checked_at": "2026-10-20"
  },
  "S18": {
    "title": "韶關生態環境局：萬國數據算力集群接入系統配套工程環評受理",
    "date": "2026-06-15",
    "url": "https://www.sg.gov.cn/zw/zdlyxxgk/dzjg/sgssthjj/hjbhxxgk/jsxmhjyxpjxx/content/post_2855829.html",
    "locator": "6/15發布公告；表列受理日期為2026-06-12，含項目名稱與建設地點",
    "type": "主管機關受理公告",
    "scope": "可識別接入配套工程；受理不是批覆、通電或驗收，未證實與 83 MW 訂單批次一對一對應。",
    "checked_at": "2026-10-16"
  },
  "S19": {
    "title": "MDEQ 2026 年 8 月官方議程",
    "date": "2026-08（議程月份）",
    "url": "https://www.mdeq.ms.gov/wp-content/uploads/2026/08/AGENDA-AUGUST-2026-All.pdf",
    "locator": "PDF 第 11–12 頁，項次 41",
    "type": "主管機關議程摘要",
    "scope": "命令 7739 26、最多 69 部臨時機組、依 Appendix A 期限停止操作及雙週申報義務。摘要不含完整附錄，不能支持精確最晚期限或現行逐台履行。 依 2026-10-20 來源稽核的官方摘要核對紀錄；本輪再次擷取受阻，未宣稱重讀原件。",
    "checked_at": "2026-10-20"
  },
  "S20": {
    "title": "MDEQ 2026 年 9 月官方議程",
    "date": "2026-09（議程月份）",
    "url": "https://www.mdeq.ms.gov/wp-content/uploads/2026/09/AGENDA-SEPTEMBER-2026-All.pdf",
    "locator": "PDF 第 11 頁，Amended Agreed Orders 項次 2",
    "type": "主管機關議程摘要",
    "scope": "修正摘要涉及四部機組退役日期及部分廠牌／型號資料；未提供可重建現行逐台期限的完整命令與 Appendix A。 依 2026-10-20 來源稽核的官方摘要核對紀錄；本輪再次擷取受阻，未宣稱重讀原件。",
    "checked_at": "2026-10-20"
  },
  "S21": {
    "title": "SemiAnalysis：Beijing Will Not Pace the Frontier",
    "date": "2026-10-08",
    "url": "https://newsletter.semianalysis.com/p/beijing-will-not-pace-the-frontier",
    "locator": "免費預覽導言及 What Beijing Says and Actually Does 開頭",
    "type": "付費文章的免費預覽／作者觀點",
    "scope": "作者 Mark Chen、Doug、Dylan Patel；僅取公開導言的治理研究問題，不採付費正文、專有資料或圖片；未逐項查核法律與事件。",
    "checked_at": "2026-10-20"
  }
}